Alstom STF Steam Turbine “A” Inspection
We recently completed another “A” Inspection on an Alstom STF Steam Turbine. This inspection consisted of inspecting the valves, bearings, H2 seals, testing of the generator, an LP crawl through, as well as an HP/IP borescope. Below is a photo of the T1 Bearing Assembly, in which the bearing was dimensionally inspected and clearances verified to be within OEM design criteria.
We perform A, B, and C inspections on the STF fleet, and many of our team members are former Alstom personnel that have the knowledge required to successfully execute these projects. Please contact us for all of your STF steam turbine outage planning and execution needs.